CEMETERY FOR THE MUNICIPALITY OF AGUADILLA

CLIENT

MUNICIPIO DE AGUADILLA

PO Box 1008 Aguadilla, PR 00605

SCHEDULE

Started : FEBRUARY 2015

Completed : OCTOBER 2016.

CONTRACT

US $ 10,058,720

Project Summary

This project involves the construction of a new cemetery for the Municipality of Aguadilla. Work includes: earthwork, site utilities and site improvements, fabrication and installation of precast concrete burial crypts and niches modules, paving and landscaping.


The project also includes: concrete foundations, slab-on-grade, steel structure, decking, roof membrane over roof insulation, sheet metal, masonry, metal stud partitions, insulation, gypsum board walls, ceilings, ceramic tile, custom cabinets, carpentry, painting, metal doors, wood doors, metal frames, door hardware, sectional overhead doors, metal fabrications, accessories and signage complete and ready for use.


The Scope

  • Excavation and Borrow fill material was originally estimated at 120,000 cubic meters and 5,000 cubic meters of excavation for structures (Burial crypts).
  • Clearing and grubbing operations in over 124,000 square meters.
  • Installation of 1,008 x 3 Precast concrete niches modules.
  • Installation of 896 x 2 Precast concrete burial crypts.
  • Construction of structures: Umbral and Ornamental fence, Main and small chapel, Module of service, Administration building, Pavilions and Niches with walls.
  • Pavement roads, sidewalk and landscaping.
  • Drainage structures and Erosion Control.